Black/Tan
Please select a Size to view availability
Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable, providing great dexterity. Cutsheild™ Para-aramid/steel/polyester liner with ANSI cut level A5 resistance for superior protection. Heavy duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. Spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keeps out dirt and debris.
Dryhide™ water resistant full-grain goatskin leather palm
Cutshield™ Para-aramid/steel/polyester liner
Heavy duty rubber on back of hand, fingers and knuckle bar
Lightweight cement construction
200g Thinulate™ insulation keeps feet warm in cooler climates
| Advanced Features | Touchscreen Compatible,Oil Resistant,Water Resistant,Cut Resistant |
|---|---|
| Advanced Technology | Thinsulate |
| Certifications | No Certifications |
| Season | All-Season |
| Cuff Style | Safety |
| Glove Type | Work Gloves |
| Care Instruction(s) | Not Applicable |
| Fill/Insulation Type | Thinsulate |
| Primary Fabric 1 | Leather |
|---|---|
| Primary Fabric 1 Percentage | 50 |
| Product Use(s) | Industrial/Scientific,General Construction |
| Closure Type | Velcro |
| Colour Group | Black |
| Consumer Pack Size | 1 |
| Gender | Male |
| Glove Fit | Traditional |
| Glove Palm | Reinforced double Palm |
| Glove Thumb Type | Not Applicable |
| Number of Pieces | 2 |
| Palm Material | Leather |
Only Show Differences | ||||||
| Ratings | ||||||
| Advanced Features | Touchscreen Compatible,Oil Resistant,Water Resistant,Cut Resistant | Touchscreen Compatible,Oil Resistant,Water Resistant,Cut Resistant | Leather | Coated | No Advanced Features | |
| Advanced Technology | Thinsulate | Thinsulate | No Advanced Technology | No Advanced Technology | No Advanced Technology | |
| Certifications | No Certifications | No Certifications | No Certifications | No Certifications | No Certifications |
Yes, I recommend this product.
Yes, I recommend this product.
Yes, I recommend this product.
Yes, I recommend this product.
Yes, I recommend this product.
Yes, I recommend this product.
No, I do not recommend this product.
