Watson Gloves

Watson Gloves Work Armour Flextime Impact With Cutshield Gloves

#005TPC
Watson Gloves Work Armour Flextime Impact With Cutshield Gloves
$44.99

Black/Tan

Buy Online :

Please select a Size to view availability

Free Shipping on eligible Ship to Home orders over $99
Quantity updated to 1
Watson Gloves
Watson Gloves

Watson Gloves Work Armour Flextime Impact With Cutshield Gloves

$44.99

Product Details

Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable, providing great dexterity. Cutsheild™ Para-aramid/steel/polyester liner with ANSI cut level A5 resistance for superior protection. Heavy duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. Spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keeps out dirt and debris.

  • Dryhide™ water resistant full-grain goatskin leather palm

  • Cutshield™ Para-aramid/steel/polyester liner

  • Heavy duty rubber on back of hand, fingers and knuckle bar

  • Lightweight cement construction

  • 200g Thinulate™ insulation keeps feet warm in cooler climates

Advanced Features Touchscreen Compatible,Oil Resistant,Water Resistant,Cut Resistant
Advanced Technology Thinsulate
Certifications No Certifications
Season All-Season
Cuff Style Safety
Glove Type Work Gloves
Care Instruction(s) Not Applicable
Fill/Insulation Type Thinsulate
Primary Fabric 1 Leather
Primary Fabric 1 Percentage 50
Product Use(s) Industrial/Scientific,General Construction
Closure Type Velcro
Colour Group Black
Consumer Pack Size 1
Gender Male
Glove Fit Traditional
Glove Palm Reinforced double Palm
Glove Thumb Type Not Applicable
Number of Pieces 2
Palm Material Leather
Online Ordering
Returns
  • Most products can be returned or exchanged at any Mark’s retail store
  • Return to our warehouse via mail at your cost
  • Returns must be made within 100 days to receive a full refund (minus the shipping charge)
  • All returns without a receipt will be credited to a store merchandise card
  • The return policy outlined above may not apply to the product you are currently viewing. For complete details and eligibility, please refer to our Return Policy for exceptions.

Reviews

Questions