Door Crasher Save up to 50% on Footwear

Shop Now

Door Crasher Save up to 50% on Footwear

Shop Now

Door Crasher Save up to $50 on Workwear

Shop Now
Support Order Status
Watson Gloves

Watson Gloves Work Armour Flextime Impact With Cutshield Gloves

#005TPC
Watson Gloves Work Armour Flextime Impact With Cutshield Gloves
$44.99

Black/Tan

Buy Online :

Please select a Size to view availability

Free Shipping on eligible Ship to Home orders over $99
Quantity updated to 1
Watson Gloves
Watson Gloves

Watson Gloves Work Armour Flextime Impact With Cutshield Gloves

$44.99

Product Details

Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable, providing great dexterity. Cutsheild™ Para-aramid/steel/polyester liner with ANSI cut level A5 resistance for superior protection. Heavy duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. Spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keeps out dirt and debris.

  • Dryhide™ water resistant full-grain goatskin leather palm

  • Cutshield™ Para-aramid/steel/polyester liner

  • Heavy duty rubber on back of hand, fingers and knuckle bar

  • Lightweight cement construction

  • 200g Thinulate™ insulation keeps feet warm in cooler climates

Advanced Features Touchscreen Compatible,Oil Resistant,Water Resistant,Cut Resistant
Advanced Technology Thinsulate
Certifications No Certifications
Season All-Season
Cuff Style Safety
Glove Type Work Gloves
Care Instruction(s) Not Applicable
Fill/Insulation Type Thinsulate
Primary Fabric 1 Leather
Primary Fabric 1 Percentage 50
Product Use(s) Industrial/Scientific,General Construction
Closure Type Velcro
Colour Group Black
Consumer Pack Size 1
Gender Male
Glove Fit Traditional
Glove Palm Reinforced double Palm
Glove Thumb Type Not Applicable
Number of Pieces 2
Palm Material Leather
Online Ordering
Returns
  • Most products can be returned or exchanged at any Mark’s retail store
  • Return to our warehouse via mail at your cost
  • Returns must be made within 100 days to receive a full refund (minus the shipping charge)
  • All returns without a receipt will be credited to a store merchandise card
  • The return policy outlined above may not apply to the product you are currently viewing. For complete details and eligibility, please refer to our Return Policy for exceptions.

Compare Similar Products

Only Show Differences
Ratings
Advanced Features Touchscreen Compatible,Oil Resistant,Water Resistant,Cut Resistant Touchscreen Compatible,Oil Resistant,Water Resistant,Cut Resistant Knuckle Protection,Impact Resistant,Shock Resistant Sustainable Sustainable
Advanced Technology Thinsulate Thinsulate D30 No Advanced Technology No Advanced Technology
Certifications No Certifications No Certifications EN388 Coup Test ISO 13997 No Certifications No Certifications

Review Highlights

List of Pros Highlights
List of Cons Highlights
Suitable Cons could not be generated at this time.

Reviews

Rating Snapshot

Select a row below to filter reviews.
7 reviews with 5 stars.
3 reviews with 4 stars.
1 review with 3 stars.
1 review with 2 stars.
0 reviews with 1 star.

Overall Rating

4.3
7 out of 9 (78%) reviewers recommend this product

Review this product

Select to rate the item with 1 star. This action will open submission form.
Select to rate the item with 2 stars. This action will open submission form.
Select to rate the item with 3 stars. This action will open submission form.
Select to rate the item with 4 stars. This action will open submission form.
Select to rate the item with 5 stars. This action will open submission form.
Adding a review will require a valid email for verification

Average Customer Ratings

    Filter Reviews

    1 to 8 of 12 Reviews
    1 – 8 of 12 Reviews

    Work ARMOUR are nice gloves

    3 years ago
    They are nice gloves, a little stiff but should break in.
    ProsDurable, Good Value, Comfortable
    FitFits small

    Yes, I recommend this product.

    Helpful?

    Perfect

    4 years ago
    Perfect in blocking my hands from getting crushed at work or cut on the sharp objects. Hands didn't get hot in the summer heat this year!
    ProsEasy Care, Fits Well, Durable, Good Value, Comfortable
    FitFits small

    Yes, I recommend this product.

    Helpful?

    Extra Safety After a Saw Mishap

    5 years ago
    Purchased these after my husband nearly lost part of a finger in a table saw accident. His previous gloves helped a bit, but this pair (I'm hoping) will HELP prevent any such mishap in the future.
    ProsFits Well, Durable, Comfortable
    FitFits true to size

    Yes, I recommend this product.

    Helpful?

    Great protection!

    5 years ago
    Excellent gloves for protecting you hands, I bought these after smashing my hand into a boat and cuased some not so nice damage! It wont happen again with these!
    ProsFits Well, Durable, Good Value, Comfortable
    FitFits true to size

    Yes, I recommend this product.

    Helpful?

    Glives that Work.

    5 years ago
    Awesome gloves! I have a farm and they are now my constant comoanions. Very comfortable and are holding up very well to the hard work of a horse farm.
    Helpful?

    Cut Resistant Glove

    4 years ago
    The overall quality is very good except for one finger on one hand where the rubber has separated from the fabric.
    ProsEasy Care, Fits Well, Durable, Good Value, Comfortable
    ConsSpecial Care Required
    FitFits true to size

    Yes, I recommend this product.

    Helpful?

    Good for motorcycle riding

    4 years ago
    These gloves are excellent for what I purchased them for - motorcycle riding. The gloves take a while to break in, and are uncomfortable until then. After that, they are great.
    ProsDurable, Good Value
    FitFits true to size

    Yes, I recommend this product.

    Helpful?

    Sturdy gloves

    4 years ago
    Have now used gloves to move big rocks and have a few comments: The small-sized gloves are too big for a woman, which means they aren't as useful. Also, they do not grip as well as I'd hoped. So rocks slide out, which was not what I expected. BUT they are very very sturdy. No rips or tears.
    ProsDurable
    ConsPoor Fit
    FitFits big

    No, I do not recommend this product.

    Helpful?
    1 – 8 of 12 Reviews

    Questions

    1 - 1 of 1 Question

    Q: I was wondering why this GLOVE has a composite toe, how does it keep your feet warm, and where is the puncture resistant plate located??? You may want to look at your Product description above .

    2 years ago
    0 Answers